Installation Checklist
Following are the steps needed to install the Tire Changer. Perform them in the order shown.
☐
1. Review the installation Safety Rules.
☐
2. Make sure you have the necessary Tools.
☐
3. Find an appropriate Location.
☐
4. Make sure there is adequate Clearance around and above.
☐
5. Unpack the Unit.
☐
6. Anchor the Unit.
☐
7. Connect to Power.
☐
8. Connect to Air.
☐
9. Prepare the Lube Bucket.
☐
10. Grease the Assist Tower Post.
☐
11. Test the Tire Changer.
☐
12. Review the Final Checklist.
R980 Series of Tire Changers
Requires a licensed Electrician
10
.
P/N 5900158 — Rev. E1 — Nov. 2019