Figure 3-4: Clearance Distance For Multiple Rack Frames Installed Side-By-Side And Rear-To-Rear; Figure 3-5: Front Panel Screws (Eight) - Samsung 136S Installation Manual

Lib system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

Confidential
Two anchor points (not rated for seismic event)

Figure 3-4: Clearance Distance for Multiple Rack Frames Installed Side-by-Side and Rear-to-Rear

1. After unpacking the rack frame, transport it to its installation location.
2. Remove the front panels, side panels and rear panel from the rack frame. Unscrew the screws on each panel and lift the
panel to undo the hooks to the frame on each panel. Do not misplace the screws, as they are needed when installing the
panels back after anchoring the rack frame.
English 8/2019. Rev 0.0
Four anchor points (Telcordia Zone 4)

Figure 3-5: Front panel screws (eight)

.
3
Installing the Product
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents