Figure 3-107: Pre-Punched Hole For Signal Cable - Samsung 136S Installation Manual

Lib system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

.
3
Installing the Product
18. For a multiple rack system, connect the signal cables "WIRE ASSY RACK TO RACK #2" between each rack's SMU. Push
the pre-punched hole to pass the cable through a circular hole in the side of the rack frame and through the opening
above Module #1 and Module #16.
NOTICE
See the examples for correct signal cable wire connections for both left and right rack
alignments.
94

Figure 3-107: Pre-Punched Hole for Signal Cable

Confidential
English 8/2019. Rev 0.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents