Installation Procedure; Figure 3-1: Installation Procedure - Samsung 136S Installation Manual

Lib system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

.
3
Installing the Product

3.3 Installation Procedure

This product must be installed by following the procedure below:
1. Preparation
Stage
 Preparation Stage
Procedure
Unpacking
Ground Wire and Tools
Recommended Tools/Instruments
Appearance Inspection
 Rack Anchoring Stage
Transport the rack frame to the installation location after unpacking
Arrange the rack frame after checking the positions of holes in the frame and anchoring points
Perform the anchoring and ground connections
 Rack Installation Stage
Transport the battery modules to the installation location
Insert the SMU in the rack frame
Insert the SMPS Assembly in the rack frame
After all components are inserted in the rack frame, attach them to the rack frame
Place the battery modules in the rack frame
Connect the busbars
Connect the signal cables from SMU to module, and module to module
Connect the signal cables from SMU to SMU
 System Installation Stage
Connect the SMPS Assembly to AC power source
Prepare the items for BMS configuration
Configure the BMS
Perform installation checks
Estimated time for each step is listed below.
20
2. Rack Anchoring
Stage

Figure 3-1: Installation Procedure

3. Rack
Installation
Installation Stage
Stage
English 8/2019. Rev 0.0
Confidential
4. System

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents