Connections on the flue gas side
Condensate drain pipe
Fig. 24
Route condensate pipe with a fall and below the anti-
flooding level of the flue gas collector.
Condensate drain
must be accessible for inspec-
A
tion.
Connection (external):
Neutralising system (if included)
Site the neutralising system behind the boiler and con-
nect it to the condensate drain.
Gas connection
Route the gas line to the back through the knock-out
aperture in the left or right-hand side panel or under
the boiler.
30
(cont.)
19 mm
7
A
Connect the neutralising system to the drainage sys-
tem.
Neutralising system installation instructions