Fitting the thermal insulation and casing
Note
All required components are included in the thermal
insulation box.
Pre-assembling the side panels
Fig. 7
1. Lay the side panels for the front, centre and back
on a suitable surface (e.g. packaging materials)
and align.
Note
Observe the cut-outs for the gas line. The cut-outs
must be at the front, at the bottom. See Fig. 9.
2. Secure the guide rails with prefitted sliding profile
to the side panels with 2 x 12 screws
the installation holes.
through
qR
13