Fitting the thermal insulation and casing
Fixing rails and retaining brackets
3.
1.
Fig. 9
Side panel perforation for gas line
A
1. Bottom fixing rails: Secure at the front with 2 x 2
screws
to the base rails, with no protrusion.
qE
2. Top fixing rails: Secure at the front and back with 2
x 2 screws
; through the middle hole at the front,
qE
and through the first hole at the back.
(cont.)
2.
A
3. Note
It is easier to install the gas pressure dampers
without the side panels. If necessary, install the
gas springs before mounting the side panels. See
Fig. 10.
Position the pre-assembled side panels with the
guide rails at the bottom, then hook onto the tabs
in the fixing rails at the top.
15