3.10 Test Points
The VC5509A EVM PLUS has thirteen (13) test points. Their position is shown in the
diagram below.
The table below shows the signals present on each test point.
TP8
TP5,TP4,TP1
Figure 3-x, TMS320VC5509A EVM PLUS Test Points
Table 12: TMS320VC5509A EVM Plus Test Points
Test Point #
TP1
TP2
TP3
TP4
TP5
TP6
TP7
TP8
TP9
TP10
TP11
TP12
+3.3 Volt Current Shunt Output
TP13
DSP Core Current Shunt Output
TP13,TP3
TP9,TP10
Signal
Ground
Ground
DSP Core Voltage
+3.3 Volts
+5 Volts
DIGIO0
DIGIO1
CPLD Spare
Ground
+5 Volt Current Shunt Output
Spectrum Digital, Inc
TP11
TP6,TP7
TP12
TP2
3-15
Need help?
Do you have a question about the TMS320VC5509A EVM PLUS and is the answer not in the manual?
Questions and answers