Interrupt Register - Spectrum Digital TMS320VC5509A EVM PLUS Technical Reference

Table of Contents

Advertisement

Spectrum Digital, Inc
McBSP0SEL and McBSP2SEL control the McBSP0 and McBSP2. Since McBSP0 is
used for Serial Boot loading the McBSP.dr pin is routed to the serial ROM at power up.
When McBSP0 is used for AIC23B operation this bit must be set to a "1". McBSP2 is
used for MMC operation at power up. Setting this bit to a "1" the McBSP2 is routed to
the daughter card connector. The power-on state of these bits (both 0s) represents that
situation. Setting the corresponding bit for McBSP2 to "1" enables the McBSP to the
expansion daughter-card instead interface.
Bit
7
6
5
4
3
2
1
0

2.1.7 Interrupt Register

The EVM allows interrupts to be generated from the "Wake Up" switch, S4. These
interrupts can be routed to various pins on the VC5509A DSP. The interrupt register
does this routing. When the corresponding bit is set to a "1" the DSP will be interrupted
by the "Wake Up" switch. The interrupts to choose from are DSP interrupts 0, 1, or 3 as
shown in the table below.
2-6
Table 5: MISC Register
Name
R/W
VCORE_CTL1
R/W
Selects Voltage Control 1
VCORE_CTL0
R/W
Selects Voltage Control 0
Reserved
R
VCORE_SEL
R/W
0 = GPIO, 1= CPLD Reg bits 6 & 7
Reserved
R
TINSEL0
R/W
TIN0 in/out on daughter card (0 = input, 1 = output)
MCBSP2SEL
R/W
McBSP2 on/off board (0 = on-board, 1 = off-board)
MCBSP0SEL
R/W
McBSP0 on/off board (0 = SROM, 1 = AIC23B)
Table 6: Interrupt Register
Bit
7
6
5
4
3
2
1
0
Description
Description
Reserved
Reserved
Reserved
Reserved
Wakeup Int3
Reserved
Wakeup Int1
Wakeup Int0
TMS320VC5509A EVM PLUS Technical Reference

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TMS320VC5509A EVM PLUS and is the answer not in the manual?

Questions and answers

Table of Contents