3.3.3.1 Analog Probe Connectors
Four connectors are available from the National Instruments connector for analog
probing. The two inputs and two outputs are shown in the table below.
The signal names on each pin are shown in the table below.
3.3.3.2 National Instruments Prototype Header
The National Instruments Prototype Header is 2 x 12 double row header. This allows
users to prototype signals to be feedback into the National Instruments interface.
The signal names on each pin are shown in the table below.
Pin #
1
3
5
7
9
11
13
15
17
19
21
23
Table 5: Analog Probe Connectors
Connector
JP4, Pin 1
JP4, Pin 2
JP5, Pin 1
JP5, Pin 2
JP6, Pin 1
JP6, Pin 2
JP7, Pin 1
JP7, Pin 2
Table 6: National Instruments Prototype Header
Signal Name
I/O/Z
P3 Pin 1
P3 Pin 37
P3 Pin 38
P3 Pin 40
P3 Pin 42
P3 Pin 10
P3 Pin 45
P3 Pin 47
P3 Pin 49
P3 Pin 51
P3 Pin 60
P3 Pin 28
Signal Name
P3 Analog Out 0
Ground
P3 Analog Out 1
Ground
P3 Analog In 6
Ground
P3 Analog In 7
Ground
Pin #
Signal Name
2
P3 Pin 2
4
P3 Pin 3
6
P3 Pin 5
8
P3 Pin 6
10
P3 Pin 41
12
P3 Pin 43
14
P3 Pin 11
16
P3 Pin 46
18
P3 Pin 48
20
P3 Pin 16
22
P3 Pin 19
24
P3 Pin _____
Spectrum Digital, Inc
I/O/Z
3-7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TMS320VC5509A EVM PLUS and is the answer not in the manual?

Questions and answers

Table of Contents