Fayat Group BOMAG BPR 35/60 Operating Instruction, Maintenance Instruction page 90

Reversible
Table of Contents

Advertisement

Maintenance – Every 2 years/every 500 operating hours
Fig. 108
Fig. 109
Fig. 110
Fig. 111
92
5.
Unscrew the bleeding screw and collect any oil running out.
6.
Screw in the bleeding screw.
B-692-0072
7.
Clean the area around the oil level inspection plug and
unscrew the plug.
B-695-0013
8.
Place a cloth underneath the filler bore to collect leaking oil.
NOTICE!
Components may get damaged!
Use only oil of the permitted specification.
9.
Fill in oil through the filler bore, until it starts to run out
through the level inspection bore.
B-695-0017
10.
Slacken the bleeding screw.
11.
Wait until all air has escaped and then tighten the bleeding
screw.
B-692-0072
BPR 35/60

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents