6
Features
6.1

Bootloader mode

To activate the bootloader mode of Expert Power Control 1000 / 1001 the button must be pushed while restarting the
device. In bootloader mode it is possible to disable the password protection, to update the firmware and to restore the default
settings by running the program GBL_Conf.exe.
If the device runs already, press the buttons "select" and "ok" for three seconds. The bootloader mode of Expert Power
Control 1000 / 1001 is indicated by "BOOT-LDR" appended to the device name in the program window of GBL_Conf.exe.
During bootloader mode an alteration of the relais is not possible.
To restart the firmware, without toggle the Power Ports, press the buttons select and ok for three seconds again.
6.2

Firmware update

In order to update the firmware the program GBL_Conf.exe and the latest firmware are needed.
Start the device in bootloader mode and run the program GBL_Conf.exe. On the left side of the program window all Gude
devices that are in the network are listed. Select the device, that should be updated, click on Program DeviceFirmware
Update and determine the location of the new firmware.
Please note: The up-to-date firmware and GBL_Conf.exe can be found at www.gude.info, free to download.
6.3

Technical information

Connections:
Network:
Protocols:
Switched Power (total):
Switched Power (per port):
Operating temperature:
Dimensions:
Weight:
6.4

Fabrique settings

In order to restore the default settings the device must be started in bootloader mode. Besides that the program GBL_Conf.
exe is required.
Run GBL_Conf.exe and select the device whose settings should be restored. Then click on Program Device -> Reset to Fab
default.
Please notice that all current settings will be deleted. The default settings will be loaded when the firmware of the device is
restarted the next time.
1 x Ethernet (RJ45)
1 x IEC C13, 230 VAC, max. 10A
iif EPC NET 1x IEC Rev. 2,
or. 1 Schukosocket
if EPC NET 1x Schuko Rev. 2
1 x IEC C20, 230 VAC, max. 10A
bei EPC NET 1x IEC Rev. 2,
bzw. 1 Schukostecker
bei EPC NET 1x Schuko Rev. 2
10/100 MBit/s 10baseT Ethernet
TCP/IP, HTTP,
SNMP v1 und v2c, SNMP traps, Syslog
10 A (~ 2000W) bei EPC NET 1x IEC Rev. 2
2500 W bei EPC NET 1x Schuko Rev. 2
10 A (~ 2000W) bei EPC NET 1x IEC Rev. 2
2500 W bei EPC NET 1x Schuko Rev. 2
0°C-50°C
120 mm x 95 mm x 65 mm (L x H x W)
ca.500g
15
Operation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Expert Power Control 1000 and is the answer not in the manual?

This manual is also suitable for:

Expert power control 1001

Table of Contents