Download Print this page

Heartland PASADENA PAVILION 10x12 Assembly Manual page 32

Advertisement

• You will À nish off the top of the roof with a ridge cap made from shingles.
BEGIN
1
Cut shingles into THREE pieces.
2"
(5,1 cm)
Weather Seal
2
Install À rst ridge cap Á ush to shingles at front, as shown.
3
Install second ridge cap 5" back, as shown.
SHINGLES - RIDGE CAP
Hint: Use cut-off pieces À rst.
2"
(5,1 cm)
2"
(5,1 cm)
(5,1 cm)
Flush
5"
12,7 cm
FRONT OF
SHED
2"
(5,1 cm)
2"
Top of slot.
Note: • You will need about 28 - 30 cut pieces.
(1) Nail per side through weather seal.
FRONT OF
SHED
(1) Nail per side through weather seal.
Flush
30
2"
(5,1 cm)
Score shingle,
then snap-off angled cut.
28 to 30
Pieces

Advertisement

loading