Download Print this page

Heartland PASADENA PAVILION 10x12 Assembly Manual page 29

Advertisement

RooÀ ng Nails 1" (2,5 cm)
To validate your warranty and prevent water damage to roof panels you must install
† You will need 54' of Drip Edge to complete your roof.
† You will need (6) bundles of shingles to complete your roof.
Do not use shingle and drip edge rooÀ ng nails longer than
3/4" long to avoid penetrating Roof Panels underside. Use
1" rooÀ ng nails for Ridge Cap.
Side that hangs over side: No Nails.
DRIP EDGE AND SHINGLES
SHINGLES &
DRIP EDGE
x 1 Box
Drip Edge as speciÀ ed below.
! IMPORTANT !
DRIP EDGE
Rafter
(3,8 cm)
RooÀ ng Nails 3/4" (1,9 cm)
3/4" Nails for
Drip Edge
Make sure nails go into
Rafters on front and back.
1-1/2"
IMPORTANT
To keep water off the edge of the Roof
Panels, you must install Drip Edge.
3/4" Nails
(1,9 cm)
Snip bottom side of drip
edge and bend over to
other side of roof.
Building Size
10' x 12' Pavilion
(304,8 x 365,8 cm)
27
x 2 Boxes
No Nails in this face.
Close up of
drip edge
1" (2,5 cm) Drip
Edge suggested
Drip Edge
54 feet
(16,32 m)

Advertisement

loading