Install second row of shingles Á ush at top of À rst row's rain slots. Ensure 1" overhang or Á ush to drip edge at front,
3
stagger each row.
FRONT OF
SHED
1"
(2,5 cm)
Notch
Flush with rain slots.
4
Continue installing rows of
shingles by staggering at front.
FRONT OF
5
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as
shown below. If shingles overlap at ridge cut to peak with a utility knife.
Cut Off.
• If more than 5" to rain slot you must install another row of shingles.
6
Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.
7
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
8
Using your shingle hooked blade carefully cut shingles along chalk line.
FINISH
9
You have À nished shingling your roof. Proceed to capping the ridge.
SHINGLES
1"
(2,5 cm)
SHED
Notch
5"
(12,7 cm) MAX.
Top of rain slot.
continued...
CUT
29