Wallstation Installation (continued)
1. Mount wallbox with appropriate depth.
2. Strip 9 mm (3/8 in) insulation from both twisted
pairs in the wallbox.

Start-up Procedure

Check Load Circuits
1. Make sure the factory-installed bypass jumper(s) are still in place between the L (Live) and DL (Dimmer Load)
terminals. Replace panel cover. Turn circuit breaker on.
2. Check the input current to the L (Live) terminal with a "clamp-on" type current probe. The current probe
should measure no more than 8,75 A.
3. Turn loads ON for at least ten minutes. If circuit breaker trips, turn power OFF, then locate and correct miswire
or overload.
Check Panel
1. With power OFF, make sure all control wiring is correct. Replace panel cover. Turn circuit breaker on.
2. Push buttons on wallstation control. The lighting should go to full, but the control indicator lights should go
on/off.
Remove Bypass Jumpers
1. Turn power OFF.
2. Remove the load circuit bypass jumper from the control panel.
3. Turn power ON. Change the scene buttons on the Grafik Eye
8 seeTouch
guestroom solutions
®
QS to make sure they adjust the light level.
®