4 COMMISSIONING

4.1 General

Sequence for commissioning:
1. Check that there are no foreign objects in unit, ducting system
or functional sections.
2. Turn the safety isolating switch to the ON position (I).
3. Select the language desired, if you have not already done so.
See Section 6.2 or 14.1.
4. The unit has factory settings which make it ready to use. See
Section 21.2 Commissioning record.
However, in many cases, these settings need to be adjusted to
suit the current installation.
Program the switch clock, operating conditions, temperatures,
airflows and functions according to the procedures in Sections
5-16.
Select whether l/s, m3/s or m3/h shall be used as the flow unit.
(INSTALLATION LEVEL in the HAND-HELD MICRO TERMINAL
menu).
Fill out the Commissioning Record and save it in the document
pocket of the unit.
5. Activate, if needed, manual or auto operation (MAIN MENU)
or lock the speed of the fans (AIR ADJUSTMENT menu).
Adjust the ducting system and air devices as described in Section
4.2.
6. Finish off with a filter calibration as described in Section 7.4.2.