Link The Screens And Enable Navigation Via Softkeys - Siemens SIMATIC C7-621 Manual

First steps with step 7-mini and protool/lite
Hide thumbs Also See for SIMATIC C7-621:
Table of Contents

Advertisement

A 03/99
The following figure shows the relationship between the value entered, the PLC program and the current
number of full bottles.
Control program
:STL
L DB46.DBW 0
Time value
SE T1
L C1
Count
T DB46.DBW 2
The values of the inputs are stored in the data interface (DB46).
The PLC program evaluates the current inputs and updates the data in the interface for output.
The C7 OP reads all the values independently from the interface and updates its display.

Link the screens and enable navigation via softkeys

To enable the second screen to be called up on the C7, you must use ProTool/Lite to configure the
screen change from start screen Start_QM to plant screen Plant_QM and back. Navigation from the
first screen entry to the second and back must also be configured for the plant screen.
To do this, assign a softkey to the Select Screen function in both of the screens. You will use these
softkeys to activate the screen change. In the plant screen, assign the Jump within Screen function in
both screen entries.
Open the screen Start_QM and select the Softkey F5 . The dialog boxes Softkey-F5 and Select
Object appear.
In the dialog box Select Objekt choose the function Select Screen from the Screens. A short
description of the function is displayed.
First Steps with the C7-621
6ZB5610-0AF02-0BA0
DB46
3
DBW0
20
DBW2
DW contains variable value
7 8 9
4 5 6
1 2 3
. 0
/
+
-
ENTER
Display and enter values in screens
SIMATIC C7-621
Filling time
3
F1
F2
F3
F5
F4
SF
DC5V
RUN
FRCE
STOP
1
2
3
4
5
6
7
8
9
0
Picture: Plant_QM
ESC
+/-
S H IF T
ENTER
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents