5.2 Tests before taking into operation

The following inspections must be carried out before each working
day or before a longer working period.
WARNING!
Danger of accident!
Please observe strictly the safety regulations in the
corresponding section of this instruction manual!
Park the machine on ground as level as possible.
Cleaning the machine.
Check:
condition of engine and machine
fuel tank and fuel lines for leaks
screw joints for tight fit
For a description of the following tasks refer to the
chapter "Daily maintenance".
Engine oil level, top up if necessary
Fuel level, top up if necessary.
Water level, top up if necessary.
BVP 10/36 / BVP 18/45
Operation
Optional equipment
31