General; Tests Before Taking Into Operation - Fayat Group BOMAG BP 12/40 Operating Instructions Manual

Hide thumbs Also See for BOMAG BP 12/40:
Table of Contents

Advertisement

Operation

4.1 General

If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter 3 "Indicators
and control elements" before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
20
4.2 Tests before taking into op-
eration
Danger
!
Loss of hearing!
Wear your personal noise protection means
(ear defenders) before starting operation.
Strictly observe the safety regulations.
Refer also to the detailed description in the
maintenance instructions.
i
Note
The running in time of the vibratory plate is 25 op-
erating hours.
The following inspections must be carried out be-
fore each working day or before a longer working
period.
Park the machine on level ground.
l
Top up missing lubricants according to the
l
maintenance instructions.
Check fuel tank and fuel lines for leaks.
l
Check condition of engine and machine.
l
Check bolted connections for tight fit.
l
Check the engine oil level.
l
Check the fuel level.
l
Check the water level in the sprinkler system
l
*
Optional equipment
BOMAG
BP 12/40, BP 20/50, BP 25/50
*
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents