Fayat Group Bomag BVP 10/36 Operating Instruction, Maintenance Instruction page 36

Forward marching vibratory plate
Hide thumbs Also See for Bomag BVP 10/36:
Table of Contents

Advertisement

Operation
Dry the spark plug with a clean cloth or blow it dry with com-
pressed air. If necessary clean with a wire brush.
Screw the spark plug back in and plug the spark plug socket
back on.
Repeat the starting procedure.
BVP 10/36 / BVP 18/45
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bvp 18/45

Table of Contents