Fayat Group Bomag BVP 10/36 Operating Instruction, Maintenance Instruction page 59

Forward marching vibratory plate
Hide thumbs Also See for Bomag BVP 10/36:
Table of Contents

Advertisement

Tightening the V-belt
Fig. 50
Pull the engine carrier back Ä Fig. 50 until the correct V-belt
tension is achieved and tighten the four fastening screws.
Assemble the V-belt guard.
NOTICE!
Check the V-belt tension again after a running time of
approx. 25 operating hours, retighten if necessary.
BVP 10/36 / BVP 18/45
Maintenance
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bvp 18/45

Table of Contents