Block Diagram For System Installation - HELIX CTI-CRYOGENICS CRYO-TORR 100 Installation, Operation And Servicing Instructions

High-vacuum pumps used with 8300 or sc (air) compressor
Table of Contents

Advertisement

ai-CRYOGENICS
UNPACK AND
UNPACK AND
UNPACK AND
UNPACK AND
INSPECT
INSPECT
INSPECT
INSPECT
CRYOPUMP
COMPRESSOR
TOOLKIT
CONTROLLER
AND
CARTON A
CARTONB
ACCESSORIES
CARTOND
CARTONC
INSTALLCRYOPUMP
TO VACUUM SYSTEM:
- CONNECTVENTPIPE
-CONNECTROUGHPUMP
- CONNECT PURGE GAS
CONNECTCRYOPUMPTO
COMPRESSOR:
- CONNECT HELIUM-GAS
RETURN AND SUPPLY LINES
- CHECK HELIUM PRESSURE
1
8300 COMPRESSOR
SC COMPRESSOR
ELECTRICAL CONNECTION OF
ELECTRICAL CONNECTION OF
COMPRESSOR, CONTROLLER AND
COMPRESSOR AND CRYOPUMP:
CRYOPUMP:
-
CONNECT COLD HEAD CABLE
- CONNECT COMPRESSOR POWER
FROM COMPRESSOR TO COLD
CABLE TO CONTROLLER AND
HEAD
COMPRESSOR
-
CONNECT COMPRESSOR INPUT
- CONNECT COMPRESSOR CON-
POWER CABLE TO MAIN POWER
TROL CABLE TO CONTROLLER
SOURCE
AND COMPRESSOR
- CONNECT COLD HEAD POWER
CABLE FROM CONTROLLER TO
COLD HEAD
- CONNECT CONTROLLER INPUT
POWER CABLE TO MAIN POWER
SOURCE
I
1
START
SYSTEM
Figure 3.1 Block diagram for system installation
3-2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CTI-CRYOGENICS CRYO-TORR 100 and is the answer not in the manual?

Table of Contents