Media Expansion Modules (Mems) - Qualstar XLS Series Site Planning Manual

Tape libraries
Hide thumbs Also See for XLS Series:
Table of Contents

Advertisement

Service Access Requirements for the XLS-812300
Figure 3-8
expansion pods are installed and that power/PC bay is slid all the way out.
Pods shown open
(maintenance
position)
Figure 3-8 Service access requirements for the XLS-812300, including expansion pods
3.1.5

Media Expansion Modules (MEMs)

All LRMs can be expanded by adding one or two MEMs on either side. The XLS-89000
holds an additional 1,075 cartridges, while the XLS-85000 contains 535 cartridges. If you
plan to install MEMs (whether during the initial installation or in the future), consider
the recommended installation order:
1.
Install the base unit.
2.
Install the MEM on the right side of the base.
3.
Install the MEM on the left side of the base.
XLS Library Site Planning Guide
shows the service access requirements for an XLS-812300, assuming that two
13.1 in
(33.3 cm)
17.6 in
(44.7 cm)
Power/PC Bay
19-Inch
Equipment Rack
(optional)
Optional Expansion Pods
(120 cartridges each)
50.5 in
(128.3 cm)
70.0 in
(177.8 cm)
3
Installing the Library
11.9 in
(30.2 cm)
34.8 in
(88.4 cm)
11.6 in
(29.5 cm)
3-23