Sleep / Awake Mode; Mounting Bracket; Typical Installation - Graco SDM8 Series Instructions Manual

Metered dispense valves
Table of Contents

Advertisement

Metered Dispense Valve Overview

Sleep / Awake Mode

Sleep: Battery-saving mode.
Awake: To wake up metered dispense
valve, press any ARROW or the center
ENTER button on the metered
dispense valve's navigation pad.
Opening and Closing the Nozzle
F
. 4
IG
To open the nozzle, use your hand to
rotate the nozzle clockwise.
To close the nozzle, use your hand to
rotate the nozzle counter-clockwise.

Mounting Bracket

Mounting Bracket Kit 249440 is available for
mounting the metered dispense valve on a
console.
F
. 5
IG
8
Open
Closed

Typical Installation

The typical installation shown in F
a guide. It is not a complete system design.
Contact your Graco distributor for assistance
in designing a system to suit your needs.
The metered dispense valve is not designed
for in-line installation.
E
F
. 6
IG
ITEM
DESCRIPTION
A
Metered Dispense Valve
B
Fluid shut-off valve
C
Hose
D
Hose reel fluid inlet hose
E
Hose reel
A Thermal Relief Kit (not shown) is
required. The kit required will vary by pump
selected.
. 6 is only
IG
B
D
C
A
3A6711C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents