EVM Setup and Operation
5. Navigate to the GUI installation directory to run the PGAxxx EVM GUI.
6. Verify that communication has been established between the EVM and the GUI by checking the EVM
Status section in the main panel, or in the status bar on the bottom left of the GUI as shown in
Figure
4.
6
PGAxxxEVM-037 Pressure Sensor Signal Conditioner Evaluation Module
Figure 3. EVM Quick Start Setup
Figure 4. EVM GUI Connection Status
Copyright © 2017, Texas Instruments Incorporated
www.ti.com
SLDU031 – December 2017
Submit Documentation Feedback