Installing Bumpers - Hussmann RL2W Installation & Operation Manual

Micro-distributed reach-in merchandisers with r-290 (propane) refrigerant
Table of Contents

Advertisement

P/N 3053328_C

INSTALLING BUMPERS

Offsetting the bumpers and top rails helps to
disguise the joint locations, giving the lineup a
smoother look.
Begin at the left end of the line-up. A starter bumper is
factory-installed with end kits. Insert the internal joint
trim, then add the full-length bumper.
Align each bumper section with its retainer and push
into place, working from the end of the lineup. Install
full length bumpers and internal joint trims offset
across joints. Make sure that no gaps exist between
sections. Continue installing bumpers the length of the
line up.
Merchandiser
Joint
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Merchandiser
Joint
Internal Joint
Trims
Full Length
Bumpers
Starter
Bumper
Do NOT install the last bumper sections at this time.
These sections will be installed in the last step.
Once all except the last section of bumper have been
installed, refrigerate the case line-up for at least six
(6) hours. The last sections of bumper should be kept
inside a refrigerated case or cooler during this time to
allow the bumpers to contract.
Before installing the last full-length section, measure
the remaining space. Use a miter box and fine-tooth
saw to cut last bumper to length. Install the last section.
Remove protective film from bumpers once installation is
complete. Optional end bumpers are factory-installed.
Bumper End Caps can be adjusted horizontally to
eliminate gaps.
1-17
Bumper
Miter Box
Reach-In

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents