VENTING FRAMING AND FINISHING (CONT'D)
EXISTING CEILING JOISTS
CEILING BELOW
vent Size
6 5/8"
8"
A
vent Size
6 5/8"
8"
Page 24
NEW FRAMING
A
B
A
B
10"
10"
10 1/2"
10 1/2"
Figure 33
B
NAILS, 4 REQUIRED
CEILING FIRESTOP
A
B
10"
10"
10 1/2"
10 1/2"
Figure 34
NAILS, 4 REQUIRED
VENT SIZE
6 5/8"
8"
See Horizontal Termination Page 26 and Vertical Termination
Pages 27 and 28.
CEILING FIRESTOP
A
B
A
B
10"
10"
10 1/2"
10 1/2"
Figure 35
39357-0-1018