Re-Commissioning The Machine; Faults; Inspections In The Event Of Faults; Electrical Faults Water-Cooled Machines - Siemens SIMOTICS HT Series Operating Instructions & Installation Instructions

Low-voltage motor
Table of Contents

Advertisement

Record the decommissioning steps. This log will be useful upon recommissioning.
8.7

Re-commissioning the machine

When you re-commission the machine, proceed as follows:
● Study the record made when the machine was decommissioned, and reverse the measures
● Perform the measures listed in the "Commissioning" section.
See also
Start-up (Page 79)
8.8

Faults

8.8.1

Inspections in the event of faults

Natural disasters or unusual operating conditions, such as overloading or short circuit, are
faults that overload the machine electrically or mechanically.
Immediately perform an inspection after such faults.
Correct the cause of the fault as described in the respective remedial measures section. Repair
any damage to the machine.
8.8.2

Electrical faults water-cooled machines

Note
When operating the machine with a converter, also refer to the operating instructions of the
frequency converter if electrical faults occur.
SIMOTICS HT Series HT-direct 1FW4...1......A
Operating Instructions 11/2018
that were taken for conservation and storage.
8.7 Re-commissioning the machine
Operation
93