Assembly
5.4 Installing the machine
5.3.9
Putting the machine down
Requirements
The following preconditions must be satisfied before setting down the machine at the
installation location:
● The mating faces must be clean.
● The anti-corrosion protection paint has been removed from the mating faces, such as the
●
Setting down the machine
● Set down the machine slowly and carefully at the installation location to avoid any impact.
5.3.10
Roughly aligning the machine
Requirement
The transmission element such as a coupling half has already been pulled on.
Roughly aligning the machine
● For horizontal positioning, push the motor sideways across the foundation. When doing so,
5.4
Installing the machine
Note
Service Center
For any installation work that is required, contact the Service Center (Page 117) or commission
service engineers trained by Siemens and authorized for this task.
56
machine mounting feet, flange, ...
There is no condensation present within the machine.
ensure that the axial position is maintained.
SIMOTICS HT Series HT-direct 1FW4...1......A
Operating Instructions 11/2018