Measures for Improving the Bearing Capacity of an Equipment Room
If the bearing capacity of the equipment room or raised floor is insufficient, arrange the
cabinet layout or enhance the equipment room. Assess the bearing capacity of the equipment
room. The following lists measures that can be taken to improve the bearing capacity of the
equipment room:
1.
(1) Correct installation direction
(4) Incorrect installation direction
2.
Issue 07 (2019-12-20)
In an equipment room built with the concrete precast slabs, install cabinets in the correct
positions. Do not place multiple cabinets on one concrete precast slab.
Figure C-3 Cabinet layout around concrete precast slabs (unit: mm)
Place the cabinet on the spandrel girder or near the bearing wall.
Copyright © Huawei Technologies Co., Ltd.
C Bearing Capacity Assessment
(2) Concrete precast slabs
(3) Wall