Page 1
Flat Tool - ZFTE Flat Tool - ZFT If you have a problem, question, or request, call your local dealer, or Steelcase Line 1 at 888.STEELCASE (888.783.3522) for immediate action by people who want to help you. (Outside the U.S.A., Canada, Mexico, Puerto Rico, and the U.S.
Page 2
Cable Manager Mounting Bracket Unpack Consolidation Point kit and check parts to parts list. Parts List • Pan Assembly (1) • Consolidation Point Mounting Brackets (4) • Cable Manager (4) • Hardware Package • Cable ID Bag (1) Mounting Plate •...
Page 3
Contact flush Identify specific frame and tile location for Consolidation Point installation. Remove tile if present. Place Consolidation Point Pan into specified frame. Center the Mounting Plate in the frame (4a). Insure top edge and bottom of pan align with edges of the frame. Align notch at bottom of pan to center location on frame.
Page 4
Install Mounting Plate using self tapping screws. Attach Door if specified (see Door instructions). Remove backing from Information Plastic Bag and attach to inside of door or skin. Insert Consolidation Point Mounting Brackets into Pan (see illustration on Mounting Plate). Place Cable Management Hardware bag into panel.
Need help?
Do you have a question about the Montage In and is the answer not in the manual?
Questions and answers