Unpacking the Chassis
Step 6
Repeat Step 4 for the rear side of the chassis.
Step 7
Attach the lift brackets to the dolly by using the M14 x 30 mm bolts and 12-mm hex bit
Bolts
).
Step 8
If the dolly caster brakes are locked, then release them and slide the dolly towards the lift brackets on the chassis
17: Sliding the Dolly to the Lift
brackets. The dolly and lift brackets must align with each other to easily insert the bolts and secure the dolly to the lift
brackets. Using two people, crank the dolly up
To make aligning easier, as you slide the dolly, tilt it as needed.
Note
Figure 17: Sliding the Dolly to the Lift Brackets
Step 9
After all bolts are secured, remove the chassis pallet following these steps:
a) Using two people (one person working on each dolly unit), turn the two lifting cranks to lift the chassis about 3/4 of
an inch above the pallet
Brackets) so that the pins on the upper side of the unit align with the holes on the lift
(Figure 18: Adjusting the Height of the
(Figure 18: Adjusting the Height of the
Cisco Network Convergence System 6000 Series Routers Unpacking, Moving, and Securing Guide
Attaching the Dolly to the Chassis and Removing the Chassis Pallet
Dolly).
(Figure 14: Lift Brackets and
(Figure
Dolly).
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Network Convergence System 6000 Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Ncs 6000Ncs 6008

Table of Contents