Download Print this page

Advertisement

Quick Links

Version 2.0
A40 V2 INSTALLATION GUIDE
201912D

Advertisement

loading
Need help?

Need help?

Do you have a question about the A40 V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Geeek A40 V2

  • Page 1 Version 2.0 A40 V2 INSTALLATION GUIDE 201912D...
  • Page 2: Screws List

    SCREWS LIST 25mm Standoff X2 40mm Standoff X4 Screws for Fan 6#32x10mm M3 Nut Screws for Radiator X4 M3x10mm M4x16mm M4x8mm M3x8mm M3x5mm Black Plastic pad...
  • Page 3 Aluminum Frame Installation Screw Acrylic Panel Please read the “Aluminum Frame installation”before assembling this case...
  • Page 4 STEP 01 250mm Aluminum Frame Aluminum Frame Installation 260mm Aluminum Frame 250mm Aluminum Frame...
  • Page 5 STEP 02 Install the HDD Bracket on the Right Aluminum Frame...
  • Page 6 STEP 03 Rear Panel Installation...
  • Page 7 STEP 04 Bottom Panel Installation...
  • Page 8 STEP 05-1 USB Module Installation Black Plastic pad USB Module Black plastic pad and i screws were placed in the same compartment of the screw box Tip: Try to move the USB module to the right as much as possible, it will be easier to install the USB module on the top panel...
  • Page 9 STEP 05-2 Power Switch and Front Panel Installation Power Switch...
  • Page 10 STEP 06 Install the Standoffs on the Left Upper and Lower Side Brackets 40mm 4X 25mm 25mm 25mm 2X...
  • Page 11 STEP 07 Install Left Upper and Lower Side Brackets on the Aluminum Frame...
  • Page 12 STEP 08 Left Upper and Lower Side Brackets Installation...
  • Page 13 STEP 09 PCIe Riser Cable Installation (Optional Purchase) PCI-e Riser Cable (Optional Purchase)
  • Page 14 STEP 10 Install and Secure the Graphic Card...
  • Page 15 STEP 11 Motherboard Installation Please install the RAM and CPU Cooler on the motherboard first...
  • Page 16 STEP 12 Power Supply Installation...
  • Page 17 STEP 13 Case Fan Installation...
  • Page 18 STEP 14 Top Panel Installation...
  • Page 19 STEP 15 2.5” SSD/HDD Installation 4~8X...
  • Page 20 STEP 16 Foot Pad Installation...
  • Page 21 STEP 17 Side Panels Installation...