Powering Up the TI545/TI555 System

Overview

!
WARNING
Start-up
Procedures
WARNING
!
Starting Up the TI555 System
6-2
This section provides general guidelines for powering up your TI545/TI555
system system.
You must be fully informed about safety procedures before you
power up the TI545/TI555 system.
Not knowing so could result in death or serious injury and/or
damage to equipment.
Review and comply with safety procedures listed in Chapter 2
before completing the following steps.
Follow these procedures when powering up your TI545/TI555 system for the
first time.
1.
Be familiar with the operation of your system components.
2.
Verify the following items.
Power Supply PPX:505-6660 requires 110 or 220 VAC input power.
If any of your installed 505 bases have empty I/O slots, use
filler bezels (part #2587705-8003) and bezel screws
(part #2587705–8001) to cover the openings in the base. This
prevents debris from getting into the system; it also helps prevent
electrostatic discharge and other types of electrical noise
interference.
After installation is complete, remove the plastic dust guard on the
top grill of every installed Series 505 base.
You must remove the dustguard from the base.
Failure to remove the dustguard may result in overheating and
damage to equipment.
This could result in death or serious injury and/or damage to
equipment.
Check for correct switch settings on all configurable modules, e.g.,
the programmable controller and RBC(s). The jumper strap (E18)
on the CPU must be strapped if you intend to copy user programs
into an installed EEPROM.
Ensure that all modules are securely plugged into the base(s),
connector pins are not bent, and bezel screws are tightened.