Download Print this page

Cable Routing - TuffStuff Apollo Series Assembly Instructions Manual

Ab/back station

Advertisement

Step 5

Cable Routing

A. Secure the looped end of the Ab/Back Cable (#9) to the bracket of the Actuator Arm (#1) using one Shoulder Bolt 3/8 X
3/4 (#58) and one Nylon Insert Lock Nut 5/16-18 (#47). See FIG. A.
B. Next, route the Ab/Back Cable (#9) passing between the Pulleys 3/8 X 4 1/2 (#22-Labeled
the Pulley 3/8 X 4 1/2 (#22-Labeled
C. Route the Cable (#9) under the Weight Stack and the Pulley 3/8 X 4 1/2 (#22-Labeled
D. Next, route the Cable (#9) up and over the Pulley 3/8 X 4 1/2 (#22-Labeled
E. Affi x the Cable (#9) to the Weight Stack using one Split Hex Tap Bolt 1/2-13 X 3 1/2 (#9), one Finished Hex Nut 1/2-13
(#33), and one Split Lock Washer 1/2" (#65). See FIG. B.
Item #
9
AB/BACK CABLE
33
FINISHED HEX NUT B/O 1/2-13
47
NYLON INSERT LOCK NUT B/O 5/16-18
9
F3
) .
Description
Assembly List
Qty.
Item #
1
58
SHOULDER BOLT ALLOY 3/8 X 3/4
1
63
SPLIT HEX TAP BOLT GR-5 B/O 1/2-13 X 3 1/2
1
65
SPLIT LOCK WASHER Z/P 1/2"
F1
&
F2
F4
).
).
F5
Description
), then route under
Qty.
1
1
1
Ab/Back Station

Advertisement

loading

This manual is also suitable for:

Apollo deluxeApollo standard