Before You Begin; Electrical Diagram - Kohler ENGLEFIELD K-78221X Installation And Care Manual

Multi point electric shower
Table of Contents

Advertisement

Available languages

Available languages

Before You Begin

Observe all local plumbing, electrical and building codes.
¨
Prior to installation, unpack the new product and inspect it for damage.
¨
The walls and the floor must be square, plumb, and level.
¨
Fixture dimensions are nominal and conform to tolerances established by
¨
Standards TIS.

Electrical Diagram

Voltage ~ 220V
50/60 Hz
Kohler Co.
TEST
Pull down the "TEST" lever to test ELCB.
Note: Test the ELCB regularly (at least once
a month).
RESET
Pull up the "RESET" lever to reset ELCB.
After pull down this lever, the power and
ELCB will resume normal operation.
E
N
L
2P Mechanical ELCB
30A/40A
15mA, <0.1s
Thermostat
(double action)
TRIAC
T1
Heater Elements
Display
Board
T2
G
N1
Main Board PCB
5
LED
FS
Flow Switch
FS
1287791-X2-C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Englefield k-78222x

Table of Contents