Download Print this page

Overview Of The Installation Procedure - Keysight N5247-60103 Installation Note

Extended power range and bias tees upgrade kit

Advertisement

Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing this option. Any necessary repairs
must be made before proceeding with this installation.
This installation requires the removal of the analyzer's protective outer covers. The analyzer
WARNING
must be powered down and disconnected from the mains supply before performing this
procedure.

Overview of the Installation Procedure

Step 1. Obtain a Keyword and Verify the Information.
Step 2. Remove the Outer Cover.
Step 3. Remove the Inner Cover.
Step 4. Remove the Front Panel Assembly.
Step 5. Remove Some Bottom-Side (Test Set) Cables.
Step 6. Remove Port 1 and Port 2 Coupler Assemblies from the Test Set Deck.
Step 7. Swap Brackets on the Port 1 and Port 2 Coupler Assemblies.
Step 8. Assemble the Port 2 and Port 3 Step Attenuators.
Step 9. Install the Step Attenuators.
Step 10. Reinstall the Port 2 and Port 3 Coupler Assemblies.
Step 11. Remove Port 3 and Port 4 Coupler Assemblies from the Test Set Deck.
Step 12. Swap Brackets on the Port 3 and Port 4 Coupler Assemblies.
Step 13. Assemble the Port 1 and Port 4 Step Attenuators.
Step 14. Install the Step Attenuators.
Step 15. Reinstall the Port 3 and Port 4 Coupler Assemblies.
Step 16. Assemble the Bias Tees.
Step 17. Install the Bias Tee Assemblies.
Step 18. Install Some Bottom-Side (Test Set) Cables.
Step 19. Install the Braces.
Step 20. Reinstall Front Panel Assembly.
Step 21. Position the Cables and Wires to Prevent Pinching.
Step 22. Reinstall the Inner Cover.
Step 23. Reinstall the Outer Cover.
Step 24. Enable Option 419.
Step 25. Perform Post-Upgrade Adjustments and Calibration.
10
Installation Note N5247-90103

Advertisement

loading