Download Print this page

Keysight N5247-60103 Installation Note page 17

Extended power range and bias tees upgrade kit

Advertisement

Step 10. Reinstall the Port 2 and Port 3 Coupler Assemblies
Refer to
Figure 3
for this step of the procedure. Use a T-10 TORX driver to tighten all screws.
Figure 3
Port 2 and Port 3 Coupler Assemblies Reinstallation
Step 11. Remove Port 3 and Port 4 Coupler Assemblies from the Test Set Deck
For instructions on removing the coupler assemblies, click the Chapter 7 bookmark "Removing and Replacing
1
the A29-A32 Reference Couplers and Reference Coupler Mounting Brackets" in the PDF Service Guide
. Save
the parts for reinstallation later.
Step 12. Swap Brackets on the Port 3 and Port 4 Coupler Assemblies
Remove the brackets from the coupler assemblies being careful to remember which bracket was removed from
each coupler. Reinstall the bracket that had been installed on the Port 1 Coupler Assembly onto the Port 2
Coupler Assembly. Next, reinstall the bracket that had been installed on the Port 2 Coupler Assembly onto the
Port 1 Coupler Assembly.
1. See
"Downloading the Online PNA Service Guide" on page
5.
16
Installation Note N5247-90103

Advertisement

loading