Overview Of The Installation Procedure - Keysight N5247-60106 Installation Note

Add 4-port capability upgrade kit

Advertisement

Installation Procedure for the Upgrade
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.

Overview of the Installation Procedure

"Step 1. Obtain a Keyword and Verify the Information."
"Step 2. Remove the Outer Cover."
"Step 3. Remove the Inner Cover."
"Step 4. Remove the Front Panel Jumper Cables and Cable Guards."
"Step 5. Remove the Front Panel Assembly."
"Step 6. Remove the Braces on the Bottom Side of the PNA."
"Step 7. Remove the A23 Test Set Motherboard."
"Step 8. Remove the Testset Stabilizer Bracket from the A24 IF Multiplexer
Board."
"Step 9. Remove Some Bottom-Side (Test Set) Cables."
"Step 10. Remove the A60 70 GHz Doubler Assembly From the Test Set
Deck."
"Step 11. Assemble the A61 70 GHz Doubler on the Doubler Mount."
"Step 12. Reinstall the A60/A61 70 GHz Doubler Assembly."
"Step 13. Remove the A63 70 GHz Doubler Assembly From the Test Set
Deck."
"Step 14. Assemble the A62 70 GHz Doubler on the Doubler Mount."
"Step 15. Reinstall the A62/A63 70 GHz Doubler Assembly."
"Step 16. Install Bracket to A10 Source Assembly."
"Step 17. Assemble the A10 26.5 GHz Source 2 Assembly."
"Step 18. Assemble and Install the A13 40 GHz Doubler Assembly."
Installation Note N5247-90106
Extra quantities of items such as protective plastic caps, screws, cable ties,
and cable clamps may be included in this upgrade kit. It is normal for some
of these items to remain unused after the upgrade is completed.
This installation requires the removal of the analyzer's protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.