12-OPERATION
12.1 Operator's Correct Working Position and
Operational Flow (Figure 12-1).
Figure 12-1
Figure 12-1
Once the box has been fi lled, close its top fl aps and
push it between the side drive belts. Always keep
hands in position (as shown in Figure 12-2).
The box will be automatically sealed with adhesive
tape on the bottom box seam.
12.2 Starting the Machine
Important: Before starting the machine, verify
that no tools or other objects are
on the conveyor bed.
Turn the main rotary switch ON after the EMER-
GENCY BUTTON is released (Figure 12-3).
12.3 Starting Production
After having adjusted the machine according to the
box dimensions (height-width), let the machine run
without cartons and check its safety devices. Then
start the working cycle.
12.4 Tape Replacement and Threading
Skill 1 - Operator
See MANUAL 2: AccuGlide™ 2+
STD 2 Inch or 3 Inch Taping Heads.
Press the LATCHING EMERGENCY STOP BUTTON.
a80b-NA
Figure 12-2
Hand Position
•
To reduce the risk associated with sharp
blade hazards:
−
Keep hands and fi ngers away from tape
cutoff blades under orange blade guards.
The blades are extremely sharp.
Figure 12-3
12.5 Box Size Adjustment
Repeat all the operations shown in
Section 11 - Buildup and Adjustments.
12.6 Cleaning
Before carrying out any cleaning or maintenance
operation stop the machine by turning the main ro-
tary switch to OFF and disconnect the electric power
(Figure 12-3).
12.7 Table of Operation Adjustments -
Operator Qualifi cations
1 Tape loading and threading
2 Tape web alignment
3 Adjustment of one way tension roller
4 Adjustment to box size (H and W)
5 Adjustment of tape applying spring
6 Conveyor bed height adjustment
7 Special Adjustment-Changing tape leg length 2
8 Special Adjustment-Column re-positioning
12.8 Safety Devices Inspection
1 Taping units blade guard
2 Latching emergency stop button
3 STOP (OFF) turn rotary switch on main power.
24
WARNING
2011 April
1
1
1
1
1
1
2