Special Regulations For Esf-E30/13 With Optional Wall Mounting; Special Regulations For Esf-E30/28 With Socket - Eaton ESF-E30 Series Mounting And Operating Instructions

Ceag mains distribution cabinet with circuit integrity
Table of Contents

Advertisement

6.3 Special regulations for ESF-E30/28
with socket
Alignment
The enclosures must be screwed to the masonry with
dowels which have a general building approval. The
static conditions must be taken into account. The screw
connection must not cause any stresses to be applied to
the housing. It must be ensured that the installation or
attachment of the electrical distributors does not impair
the stability, sound insulation and fire resistance of the
adjacent component - even in the event of fire.
The approval object of type "US-S ESF30 13-S" must be
suspended from solid walls (d ≥ 240 mm) with a fire resis-
tance duration of at least 30 minutes. The approval object
of type "US-S ESF30 28-S" must be placed vertically on
solid walls (d ≥ 240 mm) and on solid ceilings (d ≥ 150
mm) made of non-combustible building materials with a
fire resistance duration of at least 30 minutes. Assignment
of the classified fire behaviour properties to the building
authority requirements in accordance with Building Regu-
lations List A Part 1 Annex 0.2.1 or 0.2.2 (in the respec-
tively valid edition, see www.dibt.de).

6.3 Special regulations for ESF-E30/28 with socket

Screw connection
For mounting the distributor housing to adjacent solid
construction components, dowels (at least M10) and steel
screws must be used that are suitable for this purpose
and that comply to the static requirements and general
constructional or European technical approvals. The special
requirements of specific general constructional approvals
or European technical approvals must be observed.
Mounting of the electrical distributors to adjacent solid
constructional components must be implemented via
factory-processed mounting facilities – so-called fixing
straps. Only steel dowels and steel screws must be used.
The screw connection must not subject the enclosure to
any tension.
Detail X
Cable
cooling room
Electrical
operation room
Detail Y
Mounting on
both sides
MANUAL ESF-E30 40071860041 (G) November 2018 www.ceag.de
Cable seizure
The cables have to meet
circuit integrity which is
required on-site.
Put the cable sheats
through the cable cooling
room and insert the cable
cores into the electrical
operating room by using
the second separation.
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sf-e30/28Sf-e30/13-sEsf-e30/13

Table of Contents