6.2 Special regulations for ESF-E30/13 without optional Wall Mounting
6.2 Special regulations for ESF-E30/13
without optional Wall Mounting
Alignment
The enclosures must be screwed to the masonry with
dowels which have a general building approval. The
static conditions must be taken into account. The screw
connection must not cause any stresses to be applied to
the housing. It must be ensured that the installation or
attachment of the electrical distributors does not impair
the stability, sound insulation and fire resistance of the
adjacent component - even in the event of fire.
The approval object of type "US-S ESF30 13-S" must be
suspended from solid walls (d ≥ 240 mm) with a fire resis-
tance duration of at least 30 minutes. The approval object
of type "US-S ESF30 28-S" must be placed vertically on
solid walls (d ≥ 240 mm) and on solid ceilings (d ≥ 150
mm) made of non-combustible building materials with a
fire resistance duration of at least 30 minutes. Assignment
of the classified fire behaviour properties to the building
authority requirements in accordance with Building Regu-
lations List A Part 1 Annex 0.2.1 or 0.2.2 (in the respec-
tively valid edition, see www.dibt.de).
16
MANUAL ESF-E30 40071860041 (G) November 2018 www.ceag.de
Screw connection
For mounting the distributor housing to adjacent solid
construction components, dowels (at least M8) and steel
screws must be used that are suitable for this purpose
and that comply to the static requirements and general
constructional or European technical approvals. The special
requirements of specific general constructional approvals
or European technical approvals must be observed. Moun-
ting of the electrical distributors to adjacent solid const-
ructional components must be implemented via factory-
processed mounting facilities – holes in the rear wall on
the inner of the distributor housing. The screw connection
must not subject the enclosure to any tension.
Insertion of cables in the enclosure
It must be ensured that cables with circuit integrity are
inserted in the enclosure vertically and without tension.
Depending on the cable equipment, the general appraisal
certificate (allgemeines bauaufsichtliches Prüfzeugnis,
ABP) or general technical approval (allgemeine bauauf-
sichtliche Zulassung, ABZ) of the relevant manufacturer
must be observed outside the enclosure.
Cable
cooling room
Electrical
operation room
Wall
mounting
Detal X
Cable seizure
The cables have to meet
circuit integrity which is
required on-site.
Put the cable sheats
through the cable cooling
room and insert the cable
cores into the electrical
operating room by using
the second separation.
Interior wall-mounting by
wall-mounting-holes.