Ceag mains distribution cabinet with circuit integrity
Table of Contents

Advertisement

6.1 Special regulations for ESF-E30/13
with optional Wall Mounting
Alignment
The enclosures must be screwed to the masonry with
dowels which have a general building approval. The
static conditions must be taken into account. The screw
connection must not cause any stresses to be applied to
the housing. It must be ensured that the installation or
attachment of the electrical distributors does not impair
the stability, sound insulation and fire resistance of the
adjacent component - even in the event of fire.
The approval object of type "US-S ESF30 13-S" must be
suspended from solid walls (d ≥ 240 mm) with a fire resis-
tance duration of at least 30 minutes. The approval object
of type "US-S ESF30 28-S" must be placed vertically on
solid walls (d ≥ 240 mm) and on solid ceilings (d ≥ 150
mm) made of non-combustible building materials with a
fire resistance duration of at least 30 minutes. Assignment
of the classified fire behaviour properties to the building
authority requirements in accordance with Building Regu-
lations List A Part 1 Annex 0.2.1 or 0.2.2 (in the respec-
tively valid edition, see www.dibt.de).
6.1 Special regulations for ESF-E30/13 with optional Wall Mounting
Screw connection
Enclosures must be screwed to the masonry with dowels
(at least M10) that have a general technical approval and
which are designed to accommodate the total weight.
Static factors must be taken into account. The screw
connection must not subject the enclosure to any tension.
For mounting the distributor housing to adjacent solid
construction components, dowels and steel screws must
be used that are suitable for this purpose and that comply
to the static requirements and general constructional or
European technical approvals. The special requirements
of specific general constructional approvals or European
technical approvals must be observed. In addition, steel
screws used must have a recess depth of at least 70
mm; the screws must be of galvanised steel, of at least
strength class 5.8 and with a diameter of at least M10.
Insertion of cables in the enclosure
It must be ensured that cables with circuit integrity are
inserted in the enclosure vertically and without tension.
Depending on the cable equipment, the general appraisal
certificate (allgemeines bauaufsichtliches Prüfzeugnis,
ABP) or general technical approval (allgemeine bauauf-
sichtliche Zulassung, ABZ) of the relevant manufacturer
must be observed outside the enclosure.
detail X
MANUAL ESF-E30 40071860041 (G) November 2018 www.ceag.de
Cable
cooling room
Electrical
operation room
Cable seizure
The cables have to meet
circuit integrity which is
required on-site.
Put the cable sheats
through the cable cooling
room and insert the cable
cores into the electrical
operating room by using
the second separation.
Exterior wall mounting by
optional wall mounting
plate with CEAG-part-no.:
40071347730