POWERHEAD
INSTALLATION
FINAL ASSEMBLY CHECK
Perform the following checks in order to ensure proper and
safe operation of the repaired unit.
•
All parts removed have been returned to the original posi-
tions.
•
Gearcase gear engagement is properly adjusted.
(See page 8-16)
•
Fuel hose routing matches service manual illustration.
(See page 9-3 and 9-4)
•
Wire routing matches service manual illustration.
(See page 9-2 to 9-4)
•
No fuel leakage is evident.
•
No water or oil leakage is evident during final test running.
6-6