Cree Link With SmartCast Technology Installation Instructions

Advertisement

When using electrical equipment, basic safety precautions should always be followed including the following:
READ AND FOLLOW ALL SAFETY INSTRUCTIONS
1. Suitable for ambient of 25C.
Peut etre utilise pour 25C temperature ambiante.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
DHCP SERVICE IS REQUIRED FOR INITIAL INSTALLATION/CONFIGURATION (SEE FIGURE 1 BELOW)
SmartCast Link
Smart Cast Link's
configuration is complete.
The SmartCast Link
sure your lighting networks have multicast enabled.

HARDWARE SETUP

STEP 1:
Connect the DC adapter to Link box and to AC power source. After
connections to the AC power are made the unit will power on.
STEP 2:
Plug your Enterprise network cable into the Eth1 port on the back of
the Link. Eth1 is used for inbound local Enterprise access to Link and
outbound Internet connectivity. See Figure 1.
STEP 3:
For SmartCast
Wireless lighting network:
®
You need to install a SmartCast
for each of your lighting networks. Refer to the SmartCast
Configuration Guide for further information on how to configure your
SmartCast
Wireless Gateway. www.cree.com/smartcast.
®
1
Power Button
1 of 2

IMPORTANT SAFEGUARDS

requires an external DHCP service for initial configuration of the SmartCast Link
Admin Tools provide an option to configure a static TCP/IP address on the Link device after initial
device requires IP multicast for communication with SmartCast
Wireless Gateway
®
Link
®
Link With SmartCast
WHAT'S IN THE BOX:
1- Link Hardware server box
1- AC power cord
1 -DC power adapter
2- 19" rack mounting hardware
For SmartCast
PoE lighting network:
®
Each virtual local area network (VLAN) that contains SmartCast
wireless fixtures should be plugged into the Link, which can support up
to five PoE lighting networks using the Eth2-Eth6 ports on the back of the
Link. See Figure 1.
STEP 4:
For further configuration of the Link, please refer to our SmartCast
Link Configuration Guide, which can be found at www.cree.com/
smartcast.
®
Technology
INSTALLATION INSTRUCTIONS
2- Wall Mount Bracket
1- DIN rail mounting kit
(OPTIONAL/Sold separately)
device. The
Lighting Networks. Please make
®
LPN00447X0001A0_F
®
®

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Link With SmartCast Technology and is the answer not in the manual?

Questions and answers

Summary of Contents for Cree Link With SmartCast Technology

  • Page 1: Important Safeguards

    Link. Eth1 is used for inbound local Enterprise access to Link and For further configuration of the Link, please refer to our SmartCast outbound Internet connectivity. See Figure 1. ® Link Configuration Guide, which can be found at www.cree.com/ STEP 3: smartcast. For SmartCast Wireless lighting network: ®...
  • Page 2 Attach the DIN rail mounting bracket to the under side of the Link box using two (2) provided screws as shown in Figure 4. © 2018 Cree, Inc. All rights reserved. For informational purposes only. Content is subject to change. See http://lighting.cree.com/warranty for warranty and specifications. Cree and SmartCast are registered trademarks, and ®...

Table of Contents