e.
The App searches storage system data through accessing the data server to look
at the corresponding energy storage system upload data.
· Ensure energy storage system cable interface is connected to the router before
using the APP.
· Ensure the router is connected to the energy storage system cable interface can
access the Internet before using the APP.
· The data shown in the APP is not the real time data, the server will refresh the
data every 15 minutes.

4.10 Trial operation of device

Trial operation process
1. Check before trial operation
2. Supply power and switch on
3. Observe MINI ES lamp
4. Test the forced charge mode
5. Record the APP data
6. End of trial operation
Check before trial operation
Before trial operation, check the installation. In the process of checking record the data, if
the device is found not to meet the requirements, it should be immediately changed.
DANGER!
Risk of short circuit
Incorrect wiring may cause short circuit.
Short circuit test shall be performed before system commissioning.
Cable resistance test
According to the description of the internal connection port, test the resistance between
grid connection port and load connection port (related tool: multi-meter), the required tests