BYD Premium LVL 15.4 Quick Start Manual

BYD Premium LVL 15.4 Quick Start Manual

Battery-box
Hide thumbs Also See for Premium LVL 15.4:

Advertisement

Quick Links

BYD Battery-Box
Premium
Quick Start Guide
LVL 15.4
BYD Europe B.V. V1.1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Premium LVL 15.4 and is the answer not in the manual?

Questions and answers

Summary of Contents for BYD Premium LVL 15.4

  • Page 1 BYD Battery-Box Premium Quick Start Guide LVL 15.4 BYD Europe B.V. V1.1...
  • Page 2 ENGLISH TECHNICAL PARAMETERS INSTRUCTION...
  • Page 3: Legal Provisions

    Legal Provisions Legal Provisions All the information in this document is the property of BYD Europe B.V. No part of this document could be reproduced in any way for business use. Internal use is allowed. BYD Europe B.V. makes no representations or warranties express or implied, with respect to this document or any of the equipment and/or software it may describe, including (with no limitation) any implied warranties of utility, merchantability, or fitness for any particular purpose.
  • Page 4: Content And Structure Of This Document

    The system must only be used as stationary equipment. The system is suitable for indoor use only. The system must only be operated in connection with a compatible inverter. The list (BYD Battery-Box Premium LVL Minimum Configuration List) of these inverters could be read on our websites.
  • Page 5: Firefighting Measures

    BYD Europe B.V. 2. Safety Inhalation: Evacuate the contaminated area and seek medical help immediately. Eye contact: Rinse eyes with flowing water for 15 minutes and seek medical help immediately. Skin contact: Wash the affected area thoroughly with soap and water and seek medical help immediately.
  • Page 6 3. Symbols on the System BYD Europe B.V. 2.2.5. Safety information of the inverter manufacturer Please read and observe all safety information of the inverter manufacturer. 3. Symbols on the System Symbol Explanation Observe the documents Observe all documents supplied with the system.
  • Page 7: Eu Declaration Of Conformity

    • Low Voltage Directive 2014/35/EU (29.3.2014 L 96/357-374) (LVD) • Radio Equipment Directive 2014/53/EU (22.5.2014 L 153/62) (RED) BYD Europe B.V. confirms herewith that the systems described in this document are in compliance with the fundamental requirements and other relevant provisions of the abovementioned directives.
  • Page 8: Technical Parameters

    [1] Test conditions: 100% DOD, 0.2C charge & discharge at + 25 ° C. The battery system Usable Energy may vary with different inverter brands. [2] Charge/discharge derating will occur between -10 °C and +5 °C [3] Refer to BYD Battery-Box Premium Limited Warranty Letter.
  • Page 9 Instructions Scope of delivery Lieferumfang Alcance de suministro Contenu de la livraison Fornitura M5X14 M6X16 M10X16 RJ45 ×1 Position Designation Battery module 1 Battery module 2 Power cable L2 Power cable L3 Screw M6× 16 Screw M10×16 Screw M5×14 Network cable Grommets (small size)
  • Page 10: Benötigte Werkzeuge

    Bonding strip Alignment pins Plastic Bolts Communication cable Grommets (big size) Quick Start Guide, Minimum Configuration List Needed tools benötigte Werkzeuge Herramientas necesarias Outils nécessaires Strumenti necessari Name Reference picture Electric Screwdriver Diagonal Pliers Torque Wrench Screwdrivers Installation location Aufstellungsort Lugar de instalación Emplacement d'installation Luogo di installazione...
  • Page 11 Installation Aufstellung Instalación Installation Installazione Master Battery Box(B2) Slave Battery Box(B1) Single system Einzelsystem Sistema único Système unique Sistema singolo 6.5mm...
  • Page 12 IN OUT 4.5Nm Single stack (Maximum two systems could be in one stack. Einzelner stapel (ein Stapel kann max. zwei Systeme beinhalten.) Pila única (máx. dos sistemas en una pila.) Pile unique (deux systèmes maximum peuvent être dans une pile.) Scaffale singolo (In uno scaffale possono esserci al massimo due sistemi.) 6.5mm 6.5mm...
  • Page 13 6.5mm 4.5Nm Multiple stacks Mehrere stapel Pilas múltiples Piles multiples Più scaffali Stack1 Stack2 Min.20mm Min.750mm Stack3...
  • Page 14 Connection Anschluss Conexión Connexion Collegamento Single system Einzelsystem Sistema único Pile unique Sistema singolo S C 1 6 - 6 1 0 m m 8 N m 1 4 m m 1 1 . 5 N m L 2T O B - L 2 T O B 1 - B 1 - , Bl a ck 1 0 m m...
  • Page 16 Connection with SMA SMA Inverter Connection with GOODWE GOODWE Inverter...
  • Page 17 Connection with VICTRON VICTRON Inverter Connection with SELECTRONIC SELECTRONIC Inverter...
  • Page 18 E己 团 圄 Single stack connection EinzelnerStapel Pila unica 回 回 Systeme unique Scaffale singolo Address1 Address2 国 国 囚 囚...
  • Page 20 Install the front covers back...
  • Page 21 English Download on the BYDB-Box App Store Be Connect Privacy Policy of Select pplication Language Welcome to Be Connect! SHEN ZHEN BYD to configure your Battery-Box Premium ELECTRONIC CO,.LTD Responsible for data processing Language English (controllers): Cancel Start con guration...
  • Page 22 Switch off the system(s) BMU and Battery-Box are 0.5S Flashing white and blue White 0.5S initiating. alternatively Blue Idle (Battery-Box is neither White Flashing white slowly charging nor discharging). Blue White Flashing white slowly Battery-Box is charging. Blue White Flashing white quickly Battery-Box is discharging.
  • Page 23 Contact Kontakt Contacto Contact Kontaktai BYD Global Service Mailbox: bboxservice@byd.com Social media link: Telephone: +86 755 89888888-47175 https://www.facebook.com/BatteryBoxBYD/ Address: No.3009,BYD Road, https://twitter.com/BYD_BatteryBox Pingshan,Shenzhen,518118,P.R.China https://www.linkedin.com/company/byd-batter y-box Website: www.bydbatterybox.com Australia Alps Power Pty Ltd Europe EFT-Systems GmbH Mailbox: Mailbox: service@eft-systems.de service@alpspower.com.au Telephone: +49 9352 8523999...

Table of Contents