Pre-Operating Instructions; Machine Break-In Period; Before Starting; Inspections For 1/2, 5, And 10 Hours - Meridian Seed Express 275 DX Operator's Manual

Bulk seed tender
Table of Contents

Advertisement

6. PRE-OPERATING INSTRUCTIONS

6.1 MACHINE BREAK-IN PERIOD

A special break-in procedure has been developed
to ensure the integrity of the seed tender when
first put into service.  Follow the Before Starting 
instructions and then follow the Inspections for 1/2,
5, and 10 Hours instructions at the appropriate
interval.
After completing these instructions, follow the
normal service schedule in the Maintenance
section and engine manual.

6.1.1 Before Starting

1. Read and follow the instructions in the Honda
engine and the Meridian Operator's Manuals.
2. Review and follow Set-Up Instructions and
the Pre-operation Checklist before starting
machine.
3. Initially check wheel bolt torque and then
again at 10, 25, and 50 miles. Refer to the
Wheel Bolt Torque Requirements section in
this manual for tightening instructions.
4. If needed, adjust the height of the hitch
assembly. Refer to the appropriate hitch
section in this manual for either the standard
trailer hitch or the gooseneck hitch.
5. Start the engine and check the controls. Be
sure that they function properly.
6.1.2 Inspections for 1/2, 5, and 10
Hours
Recheck machine fluid levels. Refill as  required.
Recheck the tension and alignment of the delivery
belt.
Recheck hardware and fasteners; frame to trailer
tie-downs, all fasteners, and wheel bolts. Tighten
to their specified torque.
At 10 hours, change the engine oil with the
specified oil.
®
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seed express 375 dx400 sldSeed express 375

Table of Contents