Installing, connecting, commissioning

4.1

Preparing installation

4.1.1

Checking delivery

Procedure
1. When you receive the delivery, check the packaging for visible damage in transit.
2. If you discover damage in transit, lodge a complaint with the carrier responsible.
Have the carrier confirm the damage in transit immediately.
3. Unpack the device at its destination.
4. Keep the original packaging for reshipping the device. See information on damage.
Note
Damage to the device during transportation and storage
If a device is transported or stored without packaging, shocks, vibrations, pressure and
humidity act on the unprotected device. Damaged packaging is an indication that the
environmental conditions have already had a large impact on the device.
The device may be damaged.
Do not dispose of the original packaging. Pack the device for transportation and storage.
5. Check that the package contents are complete and undamaged.
7KN POWERCENTER 3000
Manual, 10/2019, L1V30579222003-01
4
19